1996
- Categories:Development Path
- Origin:
- Time of issue:2022-03-29 11:11
- Views:
(Summary description)The company has undertaken the design and installation of the second complete set of equipment for the production line of 2 million square meters of gypsum board in Pingyi County. The line is dried by heat transfer oil.
1996
(Summary description)The company has undertaken the design and installation of the second complete set of equipment for the production line of 2 million square meters of gypsum board in Pingyi County. The line is dried by heat transfer oil.
- Categories:Development Path
- Author:
- Origin:
- Time of issue:2022-03-29 11:11
- Views:
The company has undertaken the design and installation of the second complete set of equipment for the production line of 2 million square meters of gypsum board in Pingyi County. The line is dried by heat transfer oil.
Scan the QR code to read on your phone
The 300,000-ton phosphogypsum powder project in Dangyang, Hubei Province was put into trial operation
Linyi Huihang 40 million square meters of gypsum board equipment is being processed hot
The company has obtained the right of self-support import and export
The company has passed the ISO9001 quality certification system
Saudi Arabia's third line officially put into operation
Contact Us
Scan QR code
Mobile version
Message
Copyright © Linyi Huihang Machinery Co., Ltd. 鲁ICP备13029513号 Powered by www.300.cn SEO